When it comes to industrial & logistics space, SLPN722 is truly in a class of its own.

722,539 sq ft of best-in-class logistics space with 3.5 MVA power, cross-dock loading capability, 18m eaves height and direct access to an on-site rail freight interchange.

Currently under construction, SLPN722 is due to complete in June 2027 with early access available from April 2027.

This is us making our move. It’s now time to make yours. 

VELOICITY AND CAPACITY

Accommodation

SQ FT SQ M
Warehouse 683,908 63,537
Offices 28,367 2,635
Hub 10,264 954
Total 722,539 67,126

All areas are approximate and estimated on a Gross External basis.

Your story
in the making

Follow along with the construction of SLPN722 – view the live timelapse cameras below.

Camera 1

Camera 2

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

Computer generated image of SLPN722

MOVE UP IN THE WORLD

18m Haunch
Height
102 Dock
Loading Doors
Photovoltaic
Panels
50kN/m2 Warehouse
Floor Loading
8 Euro Dock
Loading Doors
Air Source
Heat Pumps
3.5 MVA
Power Supply
8 Level Access
Loading Doors
Rainwater
Harvesting
Targeting WiredScore ‘Platinum’
Gatehouse Security
55m Deep Front & Rear Yards
560 Car Parking Spaces
135 Covered Cycle Spaces
186 HGV Parking Spaces
Electric Vehicle Charging
Gated yard with 24/7
on-site security
Targeting BREEAM
'Outstanding'
Targeting EPC ‘A+’
Net-Zero Carbon
Construction
Border

MOVE FROM ROAD TO RAIL

Reduce your logistics costs by up to 30% through utilising rail freight. SLPN722 gives you direct access to on-site strategic rail freight interchange operated by Maritime Transport. Make your move and reduce your carbon emissions by up to 76% per tonne when compared to road haulage.

FAQs

What is SLPN722?

SLPN722 is a best-in-class, cross-dock industrial and logistics facility within SEGRO Logistics Park Northampton. Totalling 722,539 sq ft, the building sits on a 34-acre plot and is currently under construction.

When will SLPN722 be available?

The construction of SLPN722 is due to complete in June 2027, with early access available from April 2027.

What sustainability features does SLPN722 offer?

SLPN722 is targeting BREEAM ‘Outstanding’, EPC ‘A+’ and WiredScore ‘Platinum’ certifications. The building will benefit from an array of energy-saving sustainability features intended to reduce occupier operating costs, with PV panels and EV chargers fitted as standard.

How much power will SLPN722 have?

SLPN722 will benefit from 3.5MVA of power, available from day one.