When it comes to industrial & logistics space, SLPN722 is truly in a class of its own.
722,539 sq ft of best-in-class logistics space with 3.5 MVA power, cross-dock loading capability, 18m eaves height and direct access to an on-site rail freight interchange.
Currently under construction, SLPN722 is due to complete in June 2027 with early access available from April 2027.
This is us making our move. It’s now time to make yours.
Follow along with the construction of SLPN722 – view the live timelapse cameras below.
Camera 1
Camera 2
SLPN722 is a best-in-class, cross-dock industrial and logistics facility within SEGRO Logistics Park Northampton. Totalling 722,539 sq ft, the building sits on a 34-acre plot and is currently under construction.
The construction of SLPN722 is due to complete in June 2027, with early access available from April 2027.
SLPN722 is targeting BREEAM ‘Outstanding’, EPC ‘A+’ and WiredScore ‘Platinum’ certifications. The building will benefit from an array of energy-saving sustainability features intended to reduce occupier operating costs, with PV panels and EV chargers fitted as standard.
SLPN722 will benefit from 3.5MVA of power, available from day one.